HomeCaribbeanCXC 2022 Timetable Now Available

CXC 2022 Timetable Now Available

UPDATE:
Click here to DOWNLOAD CXC 2022 Revised Timetable


CXC 2022 Examinations Administration Strategy

BRIDGETOWN, Barbados – The Caribbean Examinations Council (CXC®) wishes to advise that the Caribbean Advanced Proficiency Examination® (CAPE®), Caribbean Secondary Education Certificate® (CSEC®) and Caribbean Certificate of Secondary Level Competence® (CCLSC®) examinations will be administered in their original format; that is, for CAPE® and CSEC® Papers 01, 02 and 031/School-Based Assessments (SBAs) or Paper 032 for private candidates, and for CCSLC®, Papers 01 and 031/School-Based Assessments. CXC® will maintain the strategy of 100% SBA moderation across all centres, for all subjects in 2022.

Examination dates are as follows:

  • May/June CAPE® examinations: 2 May – 10 June 2022
  • May/June CSEC®: 2 May – 3 June 2022;
  • CCSLC® examinations: 6 – 9 June 2022; and
  • CPEA® examinations: 27 – 28 May 2022.

Caribbean Vocational Qualification* (CVQ*) assessment will be conducted between May and July 2022. Dates will be determined by individual participating territories.

CXC 2022 official timetables are available at www.cxc.org/download-timetables.

CXC® has once again put concessions in place to support students in light of the ongoing COVID-19 pandemic. These include:

  • School Based Assessments (SBAs) – The reductions to SBA Requirements made in 2021, as much as 50 per cent in some subjects, were maintained.
  • Option to Defer – The deferral strategy has been extended for use any time prior to the administration of a subject. Candidates will be able to defer to January or June 2023, whenever the subject is administered.

As we look ahead to 2023, CXC® continues to work with regional Ministries of Education on its digital transformation strategy. Plans are currently underway to begin administering all Paper 01 examinations electronically in 2023.

Students may visit www.cxc.org/student-central for all official news and updates from CXC 2022.

DOWNLOAD TIMETABLES

 

- Advertisment -

Must Read

Water pipeline planned shutdown – Oct 10

Planned shutdown due to repairs to raw water pipeline The Water and Sewerage Company Inc. (WASCO) wishes to advise consumers in the northern region of...